How Long Does It Take to Build an In-Ground Pool?

How long does it take to build an in-ground pool?
This is a question many people ask when they start planning for one at home.
Although it may seem like a straightforward project, it requires time and involves several steps.
From selecting the design and obtaining permits to managing weather conditions and coordinating with workers, numerous factors must be considered.
Every pool is different, so the time required can vary.
In this blog, we will explain each step of the process, so you know what to expect before your pool is ready for use.
Getting Started with Designing Your Pool
This is where the magic starts happening, and where you’ll spend about 1 to 3 weeks turning those backyard daydreams into actual blueprints.
You’ll work with a designer to nail down the fun stuff: shape, size, and features like spas or waterfalls.
While you are dreaming big, they will handle the boring-but-essential tasks like submitting permits, arranging soil tests, and making sure everything meets local codes.
The permit process can be unpredictable depending on your city, so patience is key.
Try to lock in your design decisions during this phase. Any major changes once construction starts can throw off your timeline and budget in ways that’ll make your wallet weep.
Pool Installation Step-by-Step Timeline
Once planning is done, the actual construction begins.
Here, each step plays a crucial role in transforming your pool design into a fully functional swimming pool.
1. Excavation and Site Preparation (2 to 5 Days)
This step begins with marking the layout and excavating the pool area according to the approved design.
Soil is removed to form the pool shape. The process is quick, but it can slow down if the site has rocky ground, a high water table, or hidden pipes.
After digging, the area is leveled and made ready for structural installation.
2. Structural Installation Based on Pool Type
The way your pool is built depends on the material you choose. Each type follows a distinct timeline and construction method.
FEATURE | FIBERGLASS POOL | VINYL LINER POOL | CONCRETE OR GUNITE POOL |
---|---|---|---|
Build Time | 2 to 5 Days | 1 to 2 Weeks | 3 to 6 Weeks |
Customization | Limited to pre-made shapes | Some flexibility | Fully customizable |
Durability | High with minimal upkeep | Moderate & linear | Very high, long-lasting |
Surface Feel | Smooth and non-abrasive | Soft and flexible | Textured, may feel rough |
Cost Range | Medium | Lowest cost option | Highest investment |
3. Plumbing and Electrical Work (1 to 2 Weeks)
This step involves adding the systems that help your pool run. Crews install pipes for water circulation, drainage, and filtration.
Wires are also added for lighting, pumps, and any heaters or automation features.
These systems must adhere to safety codes and often require regular inspections.
If delayed, this step can significantly impact the entire project timeline.
4. Decking and Coping (1 to 3 Weeks)
Decking and coping shape the finished area around the pool, determining its appearance and feel.
Coping is placed at the edge of the pool, and materials like concrete, pavers, or stone are used for the deck.
Each material needs different installation and curing times. Weather and design complexity can make this step take longer than expected.
5. Interior Finish and Water Fill (3 to 7 Days)
This step gives the pool its final appearance. A surface finish, like plaster, pebble, or tile, is applied to the interior.
Once it sets properly, the pool is slowly filled with water.
Chemicals are added, and equipment is tested to check that everything runs smoothly.
The water is also brushed and cleaned to make sure it is ready for use.
6. Final Inspections and Handover (1 to 3 Days)
In the final stage, local inspectors verify that the pool complies with safety regulations.
This includes fencing, gate locks, drain covers, and wiring.
Once approved, the builder gives you a walkthrough on how to maintain and operate your pool.
You also receive warranty documents and care instructions before the pool is officially ready for swimming.
Estimated Total Time to Build an In-Ground Pool
The full installation timeline varies depending on the pool type, site conditions, and contractor efficiency.
On average, homeowners can expect the following durations:
- Fiberglass Pool: 4–6 weeks
- Vinyl Liner Pool: 6–8 weeks
- Concrete/Gunite Pool: 8–12+ weeks
Unexpected delays like weather or permits can extend timelines, so always add extra time when planning your pool project.
What Can Slow Down or Speed Up Pool Construction?
While every pool project follows a general timeline, certain factors can cause delays or expedite the process.
Here are the most common ones to keep in mind:
- Weather Conditions: Rain, extreme heat, or cold can delay digging, concrete curing, and finish work.
- Permit and Approval Delays: Some cities take longer due to zoning rules, backlogs, or required revisions.
- Soil and Site Challenges: Rocky ground, uneven land, or underground utilities complicate excavation.
- Material and Contractor Availability: Shortages of equipment or busy crews during peak season cause delays.
- Mid-Project Design Changes: Any modifications after work begins require extra time and adjustments.
Most delays are temporary, but understanding potential slowdowns helps you set realistic expectations and avoid those “when will this be done?” conversations that nobody enjoys.
The Bottom Line
Building a pool is a big step, but also an exciting one. Most projects take between four and twelve weeks, depending on the pool type and other conditions.
However, with early planning and a reliable builder, the process becomes much smoother.
Just think about warm days spent swimming and relaxing in your own backyard.
Feels like the perfect escape, right?
So what’s holding you back? Talk to a professional pool builder and start planning today.